Béres Pharmaceuticals Ltd. is committed to renewable energy, so the electricity needs of the Mikoviny Street headquarters will be partially covered by solar energy.
System size: 50 kVA / 69,66 KW
Design, technical preparation:
- Optimal sizing
- Proposing sites, taking into account future expansion possibilities and future changes
Installation on flat roof and corrugated sheet roof building. Full project management was provided during the execution of the project.